Final evaluation of RCRC (WATHAB)"critical water infrastructure in Jordan 2014-2020”.
this project is in partnership with an overseas advisory group (OAG) to evaluate the impact of urban water supply systems, and improvements implemented by CRC from 2014 to 2020 in the affected areas of Irbid, Mafraq, and Maan in Jordan.
Need assessment and management of water and wastewater projects for the rehabilitation of wastewater and water projects in Yemen.
Development of feasibility studies tender documents and construction management of critical water (solar power systems, water pump stations water distribution network) and wastewater (sewage treatment plants and collection system) infrastructure in affected areas in Yemen.
Capacity Assessment and Development of WASH staff in Syria.
Developed assessment tool,Data collection,Data analysis ,Development of Training Materials,Training Facilitation, Employer: Save the Children UK.
Water systems rehabilitation contract management.
Prepare technical documents for the repair/rehabilitation and operation of water systems in North West Syria Employer: UNICEF MENARO
Rehabilitation/Repair and maintenance/Operation and start-up of Azraq camp wastewater treatment unit MBBR – Jordan.
Prepare tender document and technical ToR of the project Resident Engineer and site supervision of repair and operation Employer: UNICEF Jordan
Water and Sanitation vulnerability map – planning tool for gap/need identification.
Development of multi-indicators needs mapping for water and wastewater Employer: Ministry of Water and Irrigation, Jordan WASH sector/ UNICEF Jordan
WASH facilities assessment of public schools in Jordan.
Develop assessment tools and criteria Survey Management
water training course in Najaf and Baghdad.
Contribute to the development of training materials,Conduct training sessions in Najaf and Baghdad,Prepare Training Evaluation and report, Name of Employer: Engicon.
Development of Solid Waste Master plan in KRG Iraq.
-Draft input to Inception Report
- Data collection
- Assist in the structure of the master plan
- Assessment of the current situation
- Assessment of the solid waste management practices
- Solid waste generation and composition data collection and assessment
- Choose a landfill site
- Topographical survey for the site (to collect from the client)
- Geotechnical data for the site (to collect from the client)
- Assist in sanitary landfill design standard drawings, specifications, and BOQ
- Contribute to drafting an operational plan
- Recommend a demonstration project
- Data for supplies and equipment in Iraq
- Analyze the existing institutional set-up and develop the proposed one
- Assist in the prepare proposed training and technical support documents
- Estimate the capital investment
- Assist in developing model guidelines for private sector participation
- Develop a plan for social issues
- Training of 20 staff from the Ministry of Municipalities
- Cover the client’s comments of the draft master plan
- Assist in developing the final master plan report
- Handing over the final master plan
Name of Employer: ECG – Eygpt .
Design of Solar powered mobile Water Treatment and training on operation and maintenance, Design the maps and the technical requirement for the work of the RO mobile units, that works on solar energy.
Imported and collect all the RO units and the solar cells in cooperation with our partner,
Conducting the test for the units,
Conduct training courses for the clients,
Conduct another training in the sites also (Baghdad, Muthana and Dohuk),
Maintenance for one year for the units mentioned above.
Name of Employer: Al Hujurat Company.
Training on Operation & Maintenance of RO Units project.
- Design the material and conduct the training Design the material of the training for the operation and maintenance of RO units.
-Conducting the ToT training to conduct training in 11 governorates.
- Review the material and the ToT training with the UN.
- Conducting the training through training workshops series in the governorates mentioned.
- Analysis of the gaps that were received in the workshops for the operation and maintenance of RO units in the 11 governorates.
- Provide the recommendation through the final report.
- Provide the clients in addition to the training with the plan for the maintenance and rehabilitation.
Name of Employer: UNICEF - Iraq.
Water Environmental Sanitation & Hygiene Assessment in public schools project, Design a customized questionnaire based on the requirement and the UN approval.
-Design a special database for this purpose.
-Provide training series for the manager’s zones, the surveyors, and all the staff related to this project.
- Analysis of the questionnaire manually rather than a custom program for analysis purposes.
- Enter all the information for more than 4000 schools in the database that we prepared.
- The questionnaire focuses on the Water Environmental Sanitation & Hygiene also on the water network in the area.
- Create technical reports.
- Provide the requested analysis reports.
- Conduct the assessment and analysis of the gaps.
- Provide the final report and the recommendation.
Name of Employer: UNICEF - Iraq.